Bridge, Closure, Roads, Traffic, Detour, Replacement, Construction

Bridge Replacement Means Road Closure, Detour

Print Version
Posted: 
Monday, June 11, 2018

A section of Township Road 340 between Range Road 25 and Range Road 24 will be closed from June 11th to July 30th for a bridge replacement project on the road.

The portion of roadway is located in the north-central portion of the County just south of the northern boundary with Red Deer County and just west of the Red Lodge Road.

A detour for traffic will be via RR 24, RR 25 and Twp Rd 334 (see map below). Local access for residents of the closed strip will be maintained. The typical hours of operation on the bridge will be 7 am to 7 pm, but the road will remain closed 24 hours a day.

All construction areas will be marked by barricades and “road closed” signs. Please observe all signage in the area and follow designated traffic routes.

The new bridge will be a single span concrete girder bridge on a steel substructure.

For more information on this closure, contact Operational Services at 403-335-3311 from 8 am to 4 pm,  Monday to Friday.

 

RELATED NEWS POSTS

Bridge, Closure, Roads, Traffic, Detour, Replacement, Construction
POSTED : 2018 June 11th

A section of Township Road 340 between Range Road 25 and Range...

RELATED NEWS POSTS

Bridge, Closure, Roads, Traffic, Detour, Replacement, Construction
POSTED : 2018 June 11th

A section of Township Road 340 between Range Road 25 and Range...